Solutions

Solutions by industry.

For each industry, how a technology division is applied: the operational problem, how the solution works, which systems it connects to, what is delivered and which indicators are measured.

Quick start

Start with one site.

Fixed-scope projects that start on one plant, line or station and deliver a result within weeks. Durations are typical and are confirmed after the site survey.

05 Energy · typically 4–6 weeks

Energy accounting for one plant

For enterprises that have to reduce energy use under the 2026 energy-saving decree. From 1 November 2026, businesses connected to ASKUE or ASKUG pay a 15% advance for electricity and gas instead of 100%.

  • Survey of meters and consumers
  • Meters and connection to the metering system
  • Energy report by line and shift
  • Ranked list of saving measures
How it works

08 Cybersecurity · typically 3–5 weeks

Cybersecurity assessment of control systems

For operators of critical information infrastructure, who must carry out cybersecurity audits of their automated control systems.

  • Inventory of control devices and connections
  • Assessment against national requirements
  • Segmentation and remote-access plan
  • Report for management
How it works

02 Software · typically 6–8 weeks

Production monitoring on one line

For textile, food and building-materials plants that record output and downtime on paper. One line is connected first; other lines follow on the same system.

  • Machines connected to the system
  • Output, downtime and OEE by shift
  • Downtime causes recorded by operators
  • Training for shift staff
How it works

01 Computer vision · typically 4–6 weeks

Video analytics on existing cameras

For sites that already have CCTV: people in restricted zones, missing protective equipment, or vehicle and wagon numbers at gates.

  • Review of existing cameras
  • Models adapted to the site
  • Alarms to the control room
  • Monthly event report
How it works

05 Energy · typically 3–4 weeks

Energy check of a pumping station

For water utilities and irrigation operators: where pumps run outside their efficient range and what to change first.

  • Power, flow and pressure measurement
  • Pump efficiency against the curve
  • Operating schedule for demand and tariff
  • Ranked list of measures
How it works

5-minute self-check

Find your first project.

Six questions about your enterprise. The result suggests where to start, and you can send it to an engineer in one step.

Mining & Metallurgy

Power & Energy Distribution

Oil & Gas

Water Resources & Water Supply

Manufacturing

Transport & Logistics

Discuss a project.

Describe the facility, the process and the task. An engineer will reply by email.