Industries
Water Resources & Water Supply
Irrigation systems and drinking-water utilities operate long networks of canals, pumping stations and pipelines. Every cubic metre has to be measured, and every pump runs on electricity.
Key processes
- Water intake
- Canals and hydraulic structures
- Pumping stations
- Treatment
- Distribution and metering
State programmes and requirements
13,310 “Smart Water” devices have been installed at water management facilities, together with online meters at 1,915 pumping stations.
Source: News Central Asia, November 20267,577 drinking-water facilities are to be equipped with meters that transmit data remotely; from 1 September 2026 facilities transferred to Uzsuvta’minot are managed through one electronic monitoring platform.
Source: Kun.uz, July 2026
Operational challenges
- Water losses not measured where they occur
- Pumping stations with high electricity consumption
- Manual operation of gates and hydraulic structures
- Consumer metering and billing without remote reading
How the solutions work
Each scenario describes how a solution is built for this industry. The scope of a specific project is agreed after a site survey.
Remote metering at pumping stations and canals
Water withdrawals and deliveries are measured by hand or not at all along the network.
How it works
- Flow and level meters at pumping stations and canal points
- Data loggers with cellular or radio link
- Data collected into the water management platform
- Balances by canal section and consumer
Systems and protocols
- Flow meters and level sensors
- The operator’s water management platform
- GIS
What is delivered
- Metering plan
- Meters, loggers and communication
- Data collection and balances
- Handover to the operator
Indicators measured
- Measured share of water delivered
- Losses by canal section
- Completeness of data
Automation of hydraulic structures
Gates and regulators are operated by hand, so distribution follows schedules rather than actual demand.
How it works
- Gate actuators with position and level sensors
- Local controllers with interlocks
- Remote control from the dispatch centre
- Distribution plans executed and logged
Systems and protocols
- PLC and RTU
- SCADA
- Water accounting
What is delivered
- Control design
- Actuators and controllers
- SCADA and dispatch screens
- Operator training
Indicators measured
- Delivered against planned water by section
- Gate operations done remotely
- Response time to a request
Drinking-water utility operations and billing
Consumer meters, network data and billing are kept in separate systems, so non-revenue water cannot be measured.
How it works
- Remote-reading consumer meters
- District metered areas with inflow meters
- Water balance by area
- Billing from meter readings
Systems and protocols
- Smart meters (AMR/AMI)
- Billing system
- GIS
What is delivered
- Metering design by area
- Data collection and balance software
- Billing interface
- Training for utility staff
Indicators measured
- Non-revenue water by area
- Share of consumers billed from remote readings
- Time to locate a leak
Energy efficiency of pumping stations
Pumps run outside their efficient range, and electricity is the largest operating cost.
How it works
- Power, flow and pressure measured per pump
- Efficiency calculated against the pump curve
- Operating schedule matched to demand and tariff
- Replacements and variable-speed drives prioritised
Systems and protocols
- Electricity meters (ASKUE)
- Station PLC and SCADA
- Maintenance records
What is delivered
- Measurement plan
- Efficiency analysis
- Operating schedule
- Ranked list of measures
Indicators measured
- kWh per cubic metre
- Pump efficiency
- Peak electrical demand
Security of water management control systems
Pumping stations and treatment plants are being connected to central platforms; these control systems are critical information infrastructure.
How it works
- Inventory of control devices and connections
- Zones and conduits with a demilitarized zone
- Industrial firewalls and controlled remote access
- Monitoring of industrial network traffic
Systems and protocols
- PLC and SCADA of stations and plants
- Central water management platform
- Remote access for operators
What is delivered
- Assessment report
- Segmentation and access design
- Configuration of firewalls and remote access
- Incident procedures and staff training
Indicators measured
- Stations behind controlled conduits
- Remote sessions logged
- Configurations backed up